Laserfiche WebLink
r <br /> 2 <br /> WHEREAS, the Division of Minerals and Geology ("DMG") recommended, and the <br /> Mined Land Reclamation Board approved, a technical revision to SGC's Reclamation Plan on <br /> November 18, 1993, specifying the details and conditions for the installation of the <br /> underground bulkheads. <br /> WHEREAS, DMG's approval included in its rationale that indefinite or perpetual mine <br /> drainage treatment was not desirable for final reclamation and that hydraulic seals offer the <br /> best alternative for final mine site reclamation. The DMG approval rationale also stated that <br /> the physical setting of the Sunnyside Mine appeared to be ideal for a hydraulic sealing scheme. <br /> WHEREAS, the Mined Land Reclamation Board's ("MLRB") approval of the technical <br /> revision specifically noted the disagreement between the WQCD and SGC regarding SGC's <br /> legal responsibility for CDPS permitting of seeps and springs after the sealing of the mine <br /> workings. The MLRB required that any measurable change in water quality or quantity in the <br /> seeps and springs of the drainages surrounding the Mine be monitored and reported to DMG <br /> and to the WQCD, required that SGC contact the WQCD in the event of any such measurable <br /> change to determine if a new or existing discharge permit for the Mine is necessary, and stated <br /> that responsibility for enforcement of potential discharge permit compliance problems would <br /> rest with the WQCD. <br /> WHEREAS, since the American Tunnel was extended to the Sunnyside Mine workings <br /> in the 1950's, and today, most water in and nearby the mine area has flowed in part out of the <br /> ground through naturally occurring seeps and springs and has flowed in part through the Mine <br /> 3891I-1.112&96 5 <br />