My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-01-19_ENFORCEMENT - M1977378
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1977378
>
1996-01-19_ENFORCEMENT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 6:01:55 AM
Creation date
6/29/2012 7:01:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
ENFORCEMENT
Doc Date
1/19/1996
Doc Name
Consent Decree and Order
From
District Court, City and County of Denver
To
DMG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(iii). Water quality monitoring station M-34 on Mineral Creek above <br /> its confluence with the Animas River, also known as USES Gage Site No. 09359010. <br /> d• Water Quality Reference Point. Water quality at the Water Quality <br /> Reference Point will be sampled at the frequency set forth in Appendix A. If requested by the <br /> Division, SGC will give a one-day notice of a monitoring event and will split samples with a <br /> Division representative who may be present. <br /> e. SGC will report results of the required monitoring to the Division by the <br /> 28th day of the month following SGC's receipt of those monitoring results. If SGC monitors <br /> any parameter more frequently than specified at the agreed locations within the basin using <br /> approved test procedures, the results of that monitoring will also be reported to the Division. <br /> VII. SCHEDULE <br /> 11. SGC will complete the seals in and close the valves at the Terry Tunnel and at <br /> the property line in the American Tunnel during the 1996 construction season. Treatment of <br /> Cement Creek and alkaline injection into the Mine pool (weather and conditions permitting) <br /> will begin concurrently with valve closure in the American Tunnel. The mitigation projects <br /> will start within thirty days of valve closure in the American Tunnel and treatment of Cement <br /> Creek. Construction is confined to summer and fall months due to the heavy winter snowfalls <br /> that occur in the Upper Animas Basin. <br /> M911_1.212&96 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.