My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-30_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1996-05-30_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 5:25:35 PM
Creation date
6/29/2012 7:01:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
5/30/1996
Doc Name
Approval
From
DMG
To
Sunnyside Gold Corp
Type & Sequence
TR19
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
for the projects listed in Appendix B. Within sixty days of SGC's submittal of Work Plans, <br /> the Division will notify SGC whether it approves or disapproves such Work Plans, and if it <br /> disapproves, will state its reasons. The Division will not unreasonably withhold its approval. <br /> If additional projects are approved, a permit for such projects will be issued by the Division. <br /> 14. The Division will determine that there has been a Successful Permit <br /> Termination Assessment if all of the following criteria are met: <br /> a. Five years have elapsed from the date of valve closure at the American <br /> Tunnel property line plug. <br /> b. Two years have elapsed since notice of mine pool equilibrium has been <br /> given pursuant to Paragraph 9a. <br /> C. Valves and pipes in the seals in the American and Terry Tunnels have <br /> been grouted. <br /> d. Hydrologic controls and seals eliminating flows from the lower <br /> American Tunnel portal have been completed, or CDPS Permit No. CO-0027529, for water <br /> treatment at the American Tunnel, will have been accepted by another party or parties. <br /> e. All projects on the "A" List are confirmed by the Division to be <br /> complete pursuant to paragraph 8a. <br /> f. Treatment of Cement Creek has ceased. <br /> g. It is demonstrated in accordance with Appendix A that the Reference <br /> Water Quality is being maintained without continued treatment of Cement Creek. <br /> 38911.3 512196 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.