My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-30_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1996-05-30_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 5:25:35 PM
Creation date
6/29/2012 7:01:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
5/30/1996
Doc Name
Approval
From
DMG
To
Sunnyside Gold Corp
Type & Sequence
TR19
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(v). Terry Tunnel Wastewater Treatment Facility Influent - If flow <br /> exists, inflow will be sampled monthly, when accessible, until no flow exists or permits are <br /> terminated. Weekly flow measurements will be taken when accessible until no flow exists or <br /> permits are terminated. <br /> (vi). Terry Tunnel Wastewater Treatment Facility Effluent - If <br /> treatment is required due to flow from portal, effluent will be sampled, when accessible, <br /> monthly until no flow exists. <br /> (vii). Monitoring required by SGC's MLR permit will continue until <br /> SGC is released from its obligations by DMG. Monitoring required by SGC's CDPS permits <br /> will continue until SGC is released from those permit obligations. <br /> b. Mitigation Sites. The receiving stream, both upstream and downstream <br /> of, and any water flowing from, the mitigation project sites identified below, will be <br /> monitored starting in the first field season of work activity at such project, and ending two <br /> years after each project is confirmed by the Division to be completed pursuant to paragraph <br /> 8a, or, if a "B" List project, at the time of either a Successful Permit Release Assessment <br /> pursuant to paragraph 14 or a Premature Termination pursuant to Section IX. Four samples <br /> will be collected yearly with at least one at high flow and at least two at low flow. <br /> (i). Koehler-Longfellow Portal and Mine Waste Dump. <br /> (ii). Gold Prince Mine. <br /> (iii). Columbus Mine. <br /> (iv). London Mine. <br /> 389//-3,5,?;96 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.