My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-05-30_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1996-05-30_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/16/2021 5:25:35 PM
Creation date
6/29/2012 7:01:11 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
5/30/1996
Doc Name
Approval
From
DMG
To
Sunnyside Gold Corp
Type & Sequence
TR19
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SGC stormwater permits will be governed by applicable regulations and not by this Consent <br /> Decree. <br /> V. SUMMARY OF WORK <br /> 9. SGC, in consideration of the mutual undertakings set forth in this Consent <br /> Decree, agrees to perform the following Work: <br /> a. American Tunnel/Terry Tunnel <br /> During 1996, SGC will complete the seals permitted in the MLR Permit, and <br /> will close the valves at the Terry Tunnel and at the property line in the American Tunnel. <br /> Once the valves are closed, it is predicted that the mine pool will start to build and will <br /> eventually reach physical equilibrium. SGC will monitor the mine pool height. The mine <br /> pool will be considered to be at physical equilibrium when the rate of rise of the mine pool has <br /> leveled off, as defined by mutual agreement between SGC and DMG pursuant to the MLR <br /> Permit. Notice that equilibrium has been reached, as determined under the MLR Permit, will <br /> be provided by SGC to the Division within thirty days of such determination. Once the pool is <br /> at equilibrium, and after the two-year observation period required by the MLR permit, SGC <br /> will grout the valves and pipes in the bulkhead seals in the American and Terry Tunnels and <br /> place additional hydraulic seals downstream of the property line seal to eliminate the American <br /> Tunnel portal discharge and to allow final reclamation of the surface facilities as required by <br /> SGC's MLR Permit. Additional DMG approvals will be necessary for such further seals. <br /> SGC may also place infiltration controls to preclude water from entering the American Tunnel. <br /> 38911-3,3,2/96 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.