Laserfiche WebLink
(9) COR-040060 - Sunnyside Basin Stormwater: authorizes discharges composed <br /> entirely of stormwater from the site to Eureka Creek in accordance with the site SWMP. <br /> (10) COR-040061 - Gold Prince Mine Stormwater: authorizes discharges composed <br /> entirely of stormwater from the site to Placer Gulch in accordance with the site SWMP. <br /> (11) COR-040063 - Gold Prince Mill Stormwater: authorizes discharges composed <br /> entirely of stormwater from the site to the Animas River in accordance with the site SWMP. <br /> WHEREAS, SGC also holds Mined Land Reclamation Permit No. M77-378 ("MLR <br /> Permit") pursuant to the Colorado Mined Land Reclamation Act, C.R.S. § 34-32-101 (1995) <br /> ("MLRA"). <br /> WHEREAS, Pursuant to the MLRA and MLR Permit, SGC has been in the process of <br /> final reclamation of the Mine, the Mayflower Mill, and the tailings impoundments at the <br /> Mayflower Mill for several years. The final reclamation plan (the "Reclamation Plan"), <br /> submitted by SGC to and approved by the Colorado Mined Land Reclamation Board, includes <br /> installation by SGC of a bulkhead at SGC's underground property line within the American <br /> Tunnel to prevent mine water from flowing directly out of the Mine workings through the <br /> American Tunnel portal to Cement Creek and installation by SGC of a bulkhead at the Terry <br /> Tunnel portal. <br /> WHEREAS, the Division of Minerals and Geology ("DMG") recommended, and the <br /> Mined Land Reclamation Board approved, a technical revision to SGC's Reclamation Plan on <br /> November 18, 1993, specifying the details and conditions for the installation of the <br /> underground bulkheads. <br /> 38911-3 5,2196 4 <br />