My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-28_PERMIT FILE - M2012032 (16)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012032
>
2012-06-28_PERMIT FILE - M2012032 (16)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:02 PM
Creation date
6/28/2012 3:23:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
PERMIT FILE
Doc Date
6/28/2012
Doc Name
112D(1) APPLICATION PACKAGE EXHIBIT H- RULE 8
From
STAR MINE OPERATIONS
To
DRMS
Email Name
RCO
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the tetrahedrite and depression of the galena. All of the products from the sulfide mineral <br />separations will be sellable. <br />Filtration and Thickening <br />The final tailings from the scavenger flotation will be sent to a thickener. The thickened underflow <br />from the thickener tank will be sent to a filter for final removal of process water which can be re- <br />used in the process. The filtered tailings will be sent via an 18 inch conveyor to a covered outside <br />shed for further haulage and reclamation. The concentrates from the flotation cells will be sent to <br />their respective concentrate filters. The water from the filters will also be reused in the process as <br />to eliminate any discharge. The filtered concentrates will be bagged in super sacks and hauled off <br />site for sale. <br />7.2 Facilities Description <br />Map C -4 shows the mine in its full extent, with both tailings /waste piles fully open. As described <br />above, the entire milling operation to produce the concentrate will be underground. The surface <br />facilities are addressed in Exhibit D and will consist of the following: <br />• 2 Tailings /waste rock embankments (Revenue Pile and Atlas Pile) <br />• Temporary waste rock stockpile area <br />• Topsoil stockpile areas <br />• Sediment Ponds #1 and #2 <br />• Mine Water Pond #3 <br />• Avalanche protection buffers and cribbing <br />• Mine Equipment storage and maintenance shop building on 6" concrete foundation <br />• Mine offices and Lunch room on 6" concrete foundation <br />• Dry room trailers (3) covered by a corrugated metal building with no foundation <br />• Designated parking and storage areas <br />Revenue Mine August 2012 T - <br />
The URL can be used to link to this page
Your browser does not support the video tag.