My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-28_PERMIT FILE - M2012032 (15)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012032
>
2012-06-28_PERMIT FILE - M2012032 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:02 PM
Creation date
6/28/2012 3:14:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
PERMIT FILE
Doc Date
6/28/2012
Doc Name
112D (1) APPLICATION PACKET INTRO - EXHIBIT G
From
STAR MINE OPERATIONS
To
DRMS
Email Name
GRM
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The basis of the design is the following: <br />a) The Atlas tailings /waste pile runoff will be gathered by Collection Ditches #1 and #2 and the <br />water will be delivered to Sediment Pond #1. Diversions #1 and #1B will divert upstream <br />runoff from the pile to Sneffels Creek and the Atlas drainage. This area may not be disturbed <br />initially and therefore, the controls may not be installed at the start of the mine <br />b) The main Revenue Mine disturbance area will be gathered by Collection Ditches #3 and #4 and <br />the water will be delivered to Sediment Pond #2. <br />c) As part of the Revenue Mine's opening under this new permit, the mine water will no longer <br />discharge into the pond west of the portal. The mine water will flow through a 12" pipe on the <br />property to Mine Water Pond # 3, where it will mix with water from an upstream diversion of <br />Sneffels, be given time for any suspended solids to settle, and then discharged into Sneffels <br />Creek. This pond will only handle a minimal amount of surface flow. <br />Maps C -2, C -3 and C -4 show the various stages of the mine operation. Map C -4 shows the <br />comprehensive system, when all structures are fully built and both tailings /waste piles will be in their <br />final contour. <br />Revenue Mine August 2012 G -17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.