My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-28_PERMIT FILE - M2012032 (15)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012032
>
2012-06-28_PERMIT FILE - M2012032 (15)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:02:02 PM
Creation date
6/28/2012 3:14:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012032
IBM Index Class Name
PERMIT FILE
Doc Date
6/28/2012
Doc Name
112D (1) APPLICATION PACKET INTRO - EXHIBIT G
From
STAR MINE OPERATIONS
To
DRMS
Email Name
GRM
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task # <br />Description <br />Time <br />Needed <br />(Months) <br />1 <br />Build new surface shop and underground shop <br />2 <br />2 <br />Regrade old Revenue waste to stable slopes, and build Sediment <br />Pond 2 and the Mine Water Pond <br />2 <br />3 <br />Mining begins. Construction of Sediment Pond 1 and Atlas <br />regrading to store imported topsoil. <br />1 <br />4 <br />Build Revenue waste pile. <br />39.6 <br />5 <br />Build Atlas waste pile. Cap and revegtate Revenue waste pile. <br />Begin storing imported topsoil for Atlas waste pile reclamation. <br />97.2 <br />6 <br />Mining ends. Cap and revegetated Atlas waste pile. Remove <br />Sediment Pond 2. <br />2 <br />7 <br />Backfill underground storage and mill portal. Remove Sediment <br />Pond 1. <br />2 <br />8 <br />Remove some surface facilities. <br />1 <br />9 <br />Backfill underground storage portal and tailings loadout portal. <br />0.5 <br />10 <br />Regrade, cap, and revegetate all remaining disturbed areas. <br />Install Revenue portal bat gate. <br />1 <br />Total months <br />148.3 <br />Total years <br />12.36 <br />Table E -1 Mine Life Timetable <br />Note: The waste piles will be reclaimed as they are constructed. Topsoil will be placed on lifts as they are completed, and revegetation will take place <br />promptly after topsoiling. <br />Revenue Mine August 2012 E - <br />