Laserfiche WebLink
Underground Equipment <br />Number <br />2 -Drum Electric or Air Slusher <br />3 <br />50 hp Tugger (Air/Electric) <br />6 <br />Production Drills, Jacklegs <br />3 -5 <br />Exploration Drills, Longhole <br />2 <br />Electric Locomotive <br />1 <br />Mine cars <br />12 <br />Surface Equipment ( a ) <br />Number <br />Front End Loader, 2 — 4 CY capacity <br />1 <br />Backhoe /Skid Loader or Excavator, 80 -hp <br />1 <br />Tailings /Waste Rock Haul Trucks, 10 -24 cy <br />capacity (b) <br />2 -3 <br />Bulldozer, 200 -hp <br />1 <br />Flat -Bed Truck, 1 -ton <br />1 <br />Pick -up Truck, 3 /4 -ton (4wd) <br />2 <br />Bobcat <br />1 <br />Sheep Foot Compactor <br />1 <br />Table D - 2 - Preliminary Mine Equipment List <br />Notes: <br />(a) Miscellaneous rental and contract equipment will be brought to the mine site as needed. <br />These could include fuel trucks, propane trucks, boom trucks, maintenance vehicles including <br />welders, pipe equipment, electrical man lifts for working on power lines, contract vent hole <br />Revenue Mine August 2012 D - <br />