Laserfiche WebLink
PRE- MINING AND MINING PLAN MAPS OF AFFECTED LANDS <br />The following maps are included in Appendix I of this application: <br />Revenue Mine August 2012 C -1 <br />EXHIBIT C <br />Map C -1 - Baseline Conditions Map <br />• Shows the site conditions prior to disturbance by this operation. <br />Map C -2 — Phase 1 Mining Extents <br />• Show the mining conditions at the beginning of the construction of the Revenue waste pile <br />Map C -3 — Phase 2 Mining Extents <br />• Shows the mining conditions after the Revenue waste pile is finished and the Atlas waste <br />pile has begun <br />Map C -4 — Phase 3 Mining Extents <br />• Shows the full mining extents when both waste piles are complete <br />Map C -5 — Shaft Surface Locations <br />• Shows the location of the three shafts in relation to the mineral claims and the main permit <br />boundary <br />Map C -6 — Cross Sections <br />• Shows cross sections of the Revenue Mine site <br />