Laserfiche WebLink
• <br /> Mine Waste Dump <br /> Page 3 <br /> Analysis <br /> Removal of waste dump material and underlying historic tailings from potential contact with <br /> water and consolidation with tailings at the Mayflower Tailings Pond #4 is a Best Management <br /> Technique as is vegetating any material left onsite coupled with upland diversions. This project <br /> should continue to improve the South Fork of Cement Creek as did the 1991 removal of the historic <br /> tailings pond. <br /> Monte <br /> Ongoing monitoring of the South Fork of Cement Creek below the site at the American Tunnel, <br /> which is required by SGC's MLR Permit, will continue until released from MLR permit obligations. <br /> Repo <br /> Due to the limited nature of this project and because the work site is within SGC's MLR permitted <br /> area, the completion of work will be reported in SGC's MLR annual report with separate WQCD <br /> notification. <br /> Budget <br /> SGC will fund this program. <br /> Remedial Goals and Objectives <br /> Continue to improve both reclamation plan and stormwater management plan to minimize impacts <br /> to Cement Creek. <br /> Contingency Plans <br /> Necessary Stormwater Management Controls were improved or installed as a final task of this <br /> project. <br /> Legal Right to Enter and Conduct Activities <br /> This project falls within the boundaries of SGC's MLR permit area. It includes lands that are <br /> privately owned and controlled by SGC through ownership or historic easements. <br />