Laserfiche WebLink
Gold Prince Mill Tailings and Waste Dump <br /> Page 4 <br /> Contingency Plans <br /> lans <br /> Removal and isolation of tailings and mine waste is planned onsite. Should this not be realistic <br /> due to groundwater conditions, SGC will haul the material to Tailings Pond#4 at the Mayflower Mill. <br /> Under SGC's MLR permit M-77-378 this material can be consolidated into Tailings Pond # 4. <br /> Sediment catchment traps will be built as needed to prevent water from carrying sediments <br /> to streams during the course of the project. <br /> Relocation of the waste and tailings will be done using practices which will prevent spillage <br /> of materials. <br /> Leizal Right to Enter and Conduct Activities <br /> This project is on property owned by Sunnyside Gold Corporation. <br /> Submitted by Sunnyside Gold Corporation <br /> 16 xie <br /> William B. Goodhard <br /> Resident Manager <br /> Attachments: <br /> Location Map <br /> Site Map <br /> Waste Deposit Disposal Drawing <br /> Soils Characterization <br /> Water Characterization <br /> Rainfall Data <br />