Laserfiche WebLink
Pride of the West Tailings <br /> Page 3 <br /> Remedial Goals and Ot.jectives <br /> Cleanup of historic tailings,removal from contact with flowing water, severing existing direct <br /> connections to the river in order to reduce the impacts to the Animas River from dissolved metals. <br /> Contingency Plans <br /> lans <br /> Construct catchments to prevent sediments from reaching the Animas River during <br /> excavation. <br /> Should the owner not allow the tailings to be placed on the property: the tailings would then <br /> be relocated, mixed with high pH material for stabilization and placed in Tailings Pond #4 at the <br /> Mayflower Mill. Under SGC's MLR Permit(M-77-378),this material can be consolidated at Tailings <br /> Pond #4. <br /> Leo Right to Enter and Conduct Activities <br /> SGC has not contacted the property owner concerning this project. No contact will be <br /> initiated until substantial agreement on remediation projects is reached with WQCD. No work will <br /> commence until proper permission is granted. <br /> Owner: Tucso, Inc <br /> Submitted by Sunny idle Gold Corporation <br /> Zle <br /> William B. Goodhard <br /> Resident Manager <br /> Attachments: <br /> Location Map <br /> Site Map <br /> Soil Characterization <br /> Water Characterization <br /> Rainfall Data <br />