My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-02-08_HYDROLOGY - M1977378 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-02-08_HYDROLOGY - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 2:50:27 PM
Creation date
6/28/2012 11:11:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
2/8/1996
Doc Name
Remediation Work Plan: Columbus Mine Portals
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Afilh <br /> p • 2St/0 (2s) <br /> P - 2(33000)t/D <br /> P - 66000t/0 <br /> p . hydraulic pressure (psi) <br /> S - fiber stress (Psi) <br /> 2 - for two pipe wells <br /> t - wall thickness (in.) <br /> 0 - nominal diameter (in..) . <br /> Ibis reduces to the minim required wall thickness for the saminal 6-in- <br /> diameter Schedule 40 pipe for the fridaY.lowden, as follows: <br /> t - PD/66000 (�) <br /> t . 2(290)6/66000 - O.OS3 in. <br /> Note: additional owner rewired factor of safety of 2. <br /> The wall thickness of the Schedule 40 nominal 6-in. diameter pipe is <br /> 0.no is. It will take approximately 4S years to reduce the original wall <br /> tilckness to 0.00 in., as follows: <br /> (0.290 - 0.053)/0.006 • 45 years = <br /> The wall thicbms for the Schedule 80 paminal 1-in. diameter Pipe is 0.179 <br /> is. The calculations are, as follows: <br /> t . 2(290)1/66000 - 0.009 in. <br /> (0.179 - 0.009j/0.00S - 34 years - <br /> The corr'osios.rate for the concrete is the bulkhead will be reduced by <br /> using Type Y sulfate resisting cement. In addition, the initial rate of acid <br /> attack will decrease rapidly because once the bulkhead valves are closed no - <br /> �-1 fres4 solution will contact the concrete. <br /> ' -16- <br />
The URL can be used to link to this page
Your browser does not support the video tag.