My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-02-08_HYDROLOGY - M1977378 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-02-08_HYDROLOGY - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 2:50:27 PM
Creation date
6/28/2012 11:11:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
2/8/1996
Doc Name
Remediation Work Plan: Columbus Mine Portals
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.• .. ,:� � •,/ � t..•"+ �• ;�ll+'•�}•`yam '.�,..`! �� y. - .•_. � . <br /> .y 1' oil <br /> W- -n. r , <br /> ve - VV/d - 204624/(14)(144)(1). - 102 psi (8) <br /> The ACI further states that the actual shear stress (ve) at the critical <br /> section shall not exceed 6 + flvc-, or 372 psig for deep beams with span/depth <br /> ratios less than L Vhen this limiting value is divided by, the owner <br /> required, 2 the limiting value is 186 psi. The actual calculated shear stress <br /> (we) of lot psi at the critical section is less than both the III psi maximum <br /> allowable shear stress (vc) and the 186 psi, critical section limiting shear <br /> stress. Therefore, the 14-ft long plug designed for the Friday Lowden <br /> pressure gradient requirement is adequate to meet the shear strength <br /> requirewent. <br /> Bending Strength Design- <br /> It is diffiwalt to obtain good adhesion between the concrete bulkhead and <br /> the roof and hoar of a tunnel. The difficulty lies is completely cleaning of <br /> �-. the floor and keeptag it clear of Mud and rock until the concrete is powVd <br /> Wj is completely filling all the voids in the roof. As a resit the analysis <br /> of beading ws based on a simply supported beam anchored at*the walls of the <br /> tuesel. This conservative design approach can be fw ther Justified by the <br /> - inability of obtainiag access to the upstream side of a bulkhead and the lag <br /> life expected of the plugs. . <br /> The first bwwding analysis performed is to calculate what length of <br /> wreinforced, plain, concrete bulkhead is necessary to beep the tensile <br /> beading stresses in the dawn stream face below ACI allowable stress. ACI <br /> (1977, sec 9.3.2) directs that a capacity reduction factor of 0.65 be cased in <br /> design. Further ACI (sec 15.11.1) directs that the design tensile bending <br /> strength be: t <br /> ft • 5 J (9) <br /> This wants to 273 psi for the 3,000 psi concrete to be used in the <br /> Friday Lowder Tunnel bulkhead. The owner required factor of safety reduces <br /> this design strength to 137 psi. MI also requires a 1.4 load factor for dead <br /> weight loads; such as bydraulic pressure.-- The required length of an.. <br /> unreinforced plain concrete bulkhead is.calculated as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.