My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996-02-08_HYDROLOGY - M1977378 (2)
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977378
>
1996-02-08_HYDROLOGY - M1977378 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2021 2:50:27 PM
Creation date
6/28/2012 11:11:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
HYDROLOGY
Doc Date
2/8/1996
Doc Name
Remediation Work Plan: Columbus Mine Portals
From
Sunnyside Gold Corp
To
DMG
Permit Index Doc Type
Hydrology Report
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
involves the conservative assumption that the bulkhead carries load from side <br /> to side acting as a one-Tray slabg but no load from roof to floor of the <br /> tunnel. The design procedure further uses a one-foot wide strip of the <br /> slab. The critical section for design is defined as 0.15 times the span is <br /> from the ribside for uniformly loaded beans, 1.5 ft in the case of the 10-ft <br /> wide Friday lorries Tunnel. The ACI specified shear strength (vc) that is <br /> available at the critical section for unreinforced deep beams with a span to <br /> depth ratio of less than five is: <br /> vc - K(1.9 rf'c) . (4) <br /> f'c • design concrete strength (Psi) . <br /> vs • vc (5) <br /> 0.8S capacity reduction factor for concrete in shear <br /> vs • nominal available shear strength (Psi) <br /> K • 3.5 - 2-9%/Vu(d) (6) <br /> !V • critical section moment (ft-lb)' <br /> Vg - critical section shear (lb) <br /> d - beam depth (ft), plug length <br /> Except K cannot exceed 2.5 and vc cannot exceed 6 ME <br /> For the Friday Lowden bulkhead No is 372,708 ft-lb, as follows: <br /> Pv - (wi/2)(0.151) - w(0.151)(0.151)/2 <br /> w • hydrostatic load (lb/ft) - <br /> ! - tunnel width (ft) <br /> My • 0.075w1= - 0.01125wi' - 0.06375w1= <br /> -7- - <br />
The URL can be used to link to this page
Your browser does not support the video tag.