Laserfiche WebLink
Sunnyside Mine Pool Mitigation <br /> Page 4 <br /> Remedial Goals and Objectives cont <br /> A basic pH of 8.5 to 9.0 is planned to counteract initial effects on pool water quality as it consumes <br /> its supply of oxygen and speeds the reactions necessary for chemical equilibrium. <br /> Contingency Plans <br /> Catchments will be installed in order to prevent potential spillage at the injection site from <br /> entering the surface waters which flow out of Sunnyside Basin <br /> Legal Rip-ht to Enter and Conduct Activities <br /> All access necessary for projects is controlled by SGC and within The Mined Land <br /> Reclamation Permit area. <br /> Submitted by Sunnyside Gold Corporation <br /> William B. Goodhard <br /> Resident Manager <br /> Attachments <br /> Location Map <br /> Site map <br /> Report on injection <br />