Laserfiche WebLink
Hernandez, Alysha <br />From: Binns, Janet <br />Sent: Wednesday, June 27, 2012 2:21 PM <br />To: DRMS- Coal -Admin <br />Subject: Lorencito Canyon Mine C1996084 NECC follow up to Inspection (6 -19 -2012) <br />Please scan as : Lorencito Canyon Mine C1996084 <br />NECC follow up to inspection (6/19/2012) <br />Thankyou <br />From: Bob Steele [ mai Ito: bobbysteeleCa) newel kcoa1.com <br />Sent: Wednesday, June 27, 2012 2:10 PM <br />To: Binns, Janet <br />Cc: Danny Miller <br />Subject: Lorencito Maintenance <br />Janet, <br />My plan for Lorencito Is to begin moving equipment this afternoon (6 -27 -2012) Steve Robinson will supply the dozer and <br />operator I am having our excavator and truck moved from New Elk to Lorencito. If every thing goes as planed we can <br />begin work on roads and culverts first then work on gulleys that doesn't need topsoil hauled in. By the time this work is <br />completed we should have the results back from our soil sampling on the pond cleanout area. If soil sample is suitable <br />then we will haul to the areas that needs additional topsoil. All the work should be done by the end of next week. At that <br />time we will schedule seeding of disturbed areas. If there is any additional work to be done we can leave our excavator <br />on site till all is satisfactory. BOB <br />