Laserfiche WebLink
• <br />RUN-OFF VOLUME <br />SEDIMENT VOLUME <br />USING THE UNIVERSAL SOIL LOSS EQUATION <br />SEDIMENT POND CAPACITY <br />The sediment pond is contructed at the low point of the <br />disturbed area on the west side of the mine site. <br />PRECIP DIRECT <br />ACRES CURVE AMOUNT RUN-OFF <br />13.800 82 2.0 0.65 <br />TOTAL REQUIRED WATER VOLUME <br />RUN-OFF <br />VOLUME AF <br />0.75 <br />0.75 <br />A= R K L S C P <br />U <br />R = rainfall factor <br />K = soil erodibility factor <br />LS = combined length slope factor <br />C = cropping management factor <br />P = erosion control practice factor <br />A = sediment,tons/acre/year <br />38.00 <br />0.70 <br />0.33 <br />1.00 <br />1.00 <br />8.78 <br />0.15 <br />THREE YEAR SEDIMENT VOLUME ACRE FEET <br />13.8 Acres 115 #/Cubic Feet <br />TOTAL REQUIRED SEDIMENT POND CAPACITY -- AF <br />0.89 <br />On August 26, 1993, James E. Stover, P.E. No. 19230 <br />certified that the sediment pond had been reconstructed <br />in accordance with the approved plan during the week of <br />August 27, 1993. The design of the sediment pond.is shown oa <br />drawing 11-3, revised 7-28-93. The certified pond capacity <br />is 0.90 acre feet. (0.75 Water + 0.15 Sediment). <br />• <br />11-2 <br />Rev. 02-15-94 <br />