Laserfiche WebLink
LIST OF MAPS <br />Map No. Title <br />1 <br />Surface Ownership <br />2 <br />Coal Ownership <br />3 <br />Vegetation <br />4 <br />Soils <br />5 <br />Regional Geology <br />6 <br />Geology /Hydrology <br />7 <br />Geologic Cross Section <br />8 <br />Pre - Mining and Post - Mining Land Use <br />9 <br />"C" Seam Progress Map <br />9A <br />"B" Seam Mine Plan <br />10 <br />Mine Facilities <br />11 <br />Road Design <br />12 <br />Existing and Final Contours and Sections <br />13 <br />Deleted <br />14 <br />Oil Storage Area <br />15 <br />Subsidence Prediction, Sections <br />16 <br />Previously Mined Areas <br />17 <br />Disturbed Area <br />LIST OF MAPS CONTAINED IN EXHIBITS <br />XY -AB XY = Exhibit Number AB = Map Number <br />11 -1 <br />Bear No. 3 Mine Sedimentation Control Plan <br />11 -2 <br />Bean No. 3 Mine Access Road Small Area Exemption <br />11 -3 <br />Sediment Pond Details <br />11-4 <br />Treatment Pond <br />11 -5 <br />Treatment Pond Bypass Ditch <br />14 -10 <br />Overburden Isopach <br />14 -11 <br />'C' Seam Isopach <br />19 -1 <br />Flood Control Plan <br />19 -2 <br />Flood Control Dike Design <br />19 -3 <br />Channel Design <br />20 -1 <br />Proposed Highway Access <br />20 -2 <br />Proposed Highway Access Road Profile A -A and Cross Sections <br />21 -1 <br />Portal Access Road Plan and Cross - Sections Topographic Map <br />21 -2 <br />Portal Access Road Plan and Cross - Sections <br />21 -3 <br />Portal Access Road Slide - 1993 <br />21 -4 <br />Portal Access Road Reconstruction - 1996 <br />22 -1 <br />Subsidence Monuments & Influence Areas <br />22 -2 <br />Landslide Monitoring Locations <br />23 -1 <br />Bear No. 3 Mine Facilities - Topsoil Plan <br />25 -1 <br />Mine No.1 and No.2 Reclamation Plan <br />25 -2 <br />1991 Vegetation Sampling <br />25 -3 <br />1992 Vegetation Sampling and Pond Reclamation Plan <br />25 -4 <br />1993 Vegetation Sampling and Pond Reclamation Plan <br />-xi- 04/12 <br />