Laserfiche WebLink
TO ZACH TRUJILLO <br />FROM: ROB ZUBER PO <br />SUBJECT: NEW ELK TR 65, SECOND ADEQUACY REVIEW FOR HYDROLOGY <br />DATE: 6/26/2012 <br />Zach — <br />This memo is a follow -up to my memo of 6/1/12 and NECC's responses (received by Division on 6/18/12) to our <br />PAR. <br />The following includes the Division's preliminary review of the TR -65 application, NECC responses, and new <br />Division comments. <br />1. Please send a revised page 2.05 -6a including the Truck Loading System under the Surface Facilities List as <br />approved by MR -113. <br />NECC: Please see revised page 2.06 -6a. <br />Division: Response is sufficient. <br />2. It appears that there may be an error on page 2.05 -9 referring to Map 13A as Drainage Basins. Map 13A is listed <br />as Sediment and Surface Water Control Silo Area while Map 13B is listed as Post Mine Topography Drainage <br />Basins. Please send a revised page 2.05 -9 correcting this error. <br />NECC: Reference to Map 13A has been removed, revised page 2.05 -9 is attached. <br />Division: Response is sufficient. <br />INTEROFFICE MEMORANDUM <br />3. Please send a revised page 2.05-11a updating Table 20 Ditch Data to include all ditches added by TR -64. <br />NECC: Ditches not currently approved should not be included in Table 20, and per DRMS email correspondence with <br />Rob Zuber dated June 12, 2012, DRMS concurs. <br />Division: Response is sufficient. <br />