My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-06-27_ENFORCEMENT - C1984065
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1984065
>
2012-06-27_ENFORCEMENT - C1984065
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:01:57 PM
Creation date
6/27/2012 9:48:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
ENFORCEMENT
Doc Date
6/27/2012
Doc Name
Notice of Violation
From
DRMS
To
C.B Minerals Company, LLC
Violation No.
CV2012005
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No.: CV- 2012 -005 <br />NATURE OF VIOLATION: <br />Failure to obtain approval of a sediment collection ditch prior to its construction. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S): 34- 33- 110(2)(0) <br />REGULATION SECTION(S): 2.05.3(4)(a) <br />PERMIT SECTION(S): <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />An unapproved sediment collection ditch has been constructed at the site sometime between the June 19, 2012 inspection <br />and the prior Complete inspection of March 19, 2012. The ditch measures 1.5 feet wide by 1.5 feet deep by 150 feet long. <br />The ditch begins in Ditch 3, near a point where Ditch 3 meets Culvert C5, and runs roughly in a south - easterly direction <br />from this point. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />Abatement Step # Description <br />1 Regrade, re- topsoil and re -seed the unapproved sediment collection ditch located uphill and south of <br />the sediment pond. <br />2 Obtain approval of an application for a Minor Revision to modify the permit so as to identify the <br />location of the reclaimed unapproved sediment collection ditch on a map and as to describe the <br />disturbance in the text of the permit <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE last abatement due date <br />Abatement Step # Due Date <br />1 7/16/2012 <br />2 7/23/2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.