Laserfiche WebLink
Demo Worksheet Cont'd Task # TTT Page 26 of 43 <br />SEAL ALL <br />SHALLOW <br />BOREHOLES (2) <br />Surface Plug <br />Portland cement <br />4 <br />1575 <br />9.00 <br />LF <br />$7.65 <br />$68.87 <br />grout - 4 in. (labor, <br />equip, materials) <br />Bottom Plug <br />PVC plug - 4 in. <br />4 <br />NA <br />2.00 <br />EA <br />$27.85 <br />$55.70 <br />diameter borehole <br />Cut Casing at <br />Exposed casing <br />4 <br />NA <br />2.00 <br />LF <br />$5.75 <br />$11.50 <br />Surface <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />2.00 <br />EA <br />$2.75 <br />$5.50 <br />location/identification <br />marker (EA, material <br />cost only) <br />Drill Rig and Labor <br />SCHRAMM <br />NA <br />NA <br />8.00 <br />EA <br />$239.12 <br />$1,912.96 <br />T450BH <br />Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />8.00 <br />EA <br />$68.18 <br />$545.44 <br />Gal. <br />SEAL DRAIN <br />PIPE AT <br />PORTALS (1) <br />Surface Plug <br />Portland cement <br />4 <br />150 <br />5.00 <br />LF <br />$7.65 <br />$38.26 <br />grout - 4 in. (labor, <br />equip, materials) <br />Bottom Plug <br />PVC plug - 4 in. <br />4 <br />NA <br />1.00 <br />EA <br />$27.85 <br />$27.85 <br />diameter borehole <br />Cut Casing at <br />Exposed casing <br />4 <br />NA <br />1.00 <br />LF <br />$5.75 <br />$5.75 <br />Surface <br />removal - 4 to 10 in. <br />diameter steel pipe <br />(LF) <br />Borehole Marker <br />Borehole <br />NA <br />NA <br />1.00 <br />EA <br />$2.75 <br />$2.75 <br />location/identification <br />marker (EA, material <br />cost only) <br />Drill Rig and Labor <br />SCHRAMM <br />NA <br />NA <br />4.00 <br />EA <br />$239.12 <br />$956.48 <br />T450BH <br />Water Truck <br />Water Tanker, 2,500 <br />NA <br />NA <br />4.00 <br />EA <br />$68.18 <br />$272.72 <br />Gal. <br />Job Hours: 36.00 Total Cost: $12,570.00 <br />CIRCES Cost Estimating Software <br />