Laserfiche WebLink
Page 1 of 43 <br />Task description: <br />Site: Southfield Mine <br />PROJECT IDENTIFICATION <br />Task #: <br />Date: <br />User: <br />COST SUMMARY WORK <br />of 2012 Midterm Review Tasks <br />Permit Action: 2012 Midterm Review <br />000 State: Colorado <br />6/25/2012 County: Fremont <br />JDM <br />Permit/Job #: C1981014 <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Abbreviation: None <br />Filename: C014 -000 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />011 <br />035 <br />036 <br />037 <br />038 <br />041 <br />042 <br />043 <br />044 <br />045 <br />046 <br />053 <br />060 <br />065 <br />066 <br />067 <br />068 <br />069 <br />070 <br />073 <br />074 <br />Replace Topsoil from Stockpile to Refuse Pile <br />SCRAPERI <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />25.41 <br />$16,866.09 <br />$9,947.68 <br />$1,831.17 <br />$1,335.62 <br />$256.75 <br />$5,154.32 <br />$6,681.53 <br />$11,539.96 <br />$12,865.56 <br />$5,512.26 <br />$2,720.34 <br />$12,569.99 <br />$8,961.51 <br />$74,618.65 <br />$18,964.20 <br />$3,206.12 <br />$2,866.32 <br />$188.90 <br />$9,531.60 <br />$7,025.05 <br />$4,707.40 <br />Backfill and Regrade Pond 4 <br />DOZER <br />38.36 <br />Bacldill and Regrade Pond 5 <br />DOZER <br />7.06 <br />Backfill and Regrade Pond L -1 <br />DOZER <br />5.15 <br />Backfill and Regrade Pond L -2 <br />DOZER <br />0.99 <br />Replace Topsoil from Stockpile L1 to East <br />Loadout <br />SCRAPER1 <br />7.77 <br />Replace Topsoil from Stockpile L2 to West <br />Loadout <br />SCRAPERI <br />10.07 <br />Replace Topsoil from Stockpile M -1 to Facilities <br />Area <br />SCRAPERI <br />17.39 <br />Replace Topsoil from Newlin CkStockpile to <br />Facilities Area <br />SCRAPERI <br />16.50 <br />Replace Topsoil from Stockpile M -3 to Ponds 3 <br />and 4 <br />SCRAPERI <br />8.31 <br />Replace Topsoil from Newlin Ck Stockpile to <br />Ponds 3 and 4 <br />SCRAPERI <br />4.10 <br />Plug and Seal All Boreholes <br />BOREHOLE <br />36.00 <br />Demolish and Remove All Strictures <br />DEMOLISH <br />125.00 <br />Reseed Facilities and Loadout Areas <br />REVEGE <br />125.60 <br />Reseed Areas of Refuse Pile Previously Seeded <br />REVEGE <br />60.00 <br />Plant Shrubs and Trees at Facilities Area <br />REVEGE <br />39.60 <br />Plant Shrubs and Trees on Refuse Pile <br />REVEGE <br />72.00 <br />Plant Trees at Loadout <br />REVEGE <br />30.20 <br />Site Maintenance <br />SITEMAINT <br />ENANCE <br />120.00 <br />Mobilize/Demobilize Equipment for Remaining <br />Reclamation <br />MOBILIZE <br />4.50 <br />Mobilize/Demobilize Equipment for Site <br />Maintenace <br />MOBILIZE <br />4.50 <br />SUBTOTALS: <br />758.51 <br />$ $217,351.02 <br />CIRCES Cost Estimating Software <br />