Laserfiche WebLink
June 18, 2012 C-1981-014/Southfield Mine JHB <br /> <br /> <br />12/2011-No surface water flow. <br />Pond inspections conducted 5/23/2012 at mine site, and 5/23/2012 <br />Lease agreements dated 3/22/1985 <br />2011 Annual Reclamation Report was sent to the Division on May 9e 2011 ARR is retained with <br />the mine records. <br />CDPS permit COG-85006-loadout, E <br />*2 Annual certification sediment ponds conducted first quarter 2 <br />-NW. No moisture or mud <br />encountered. Water samples collected at MW-23 and MW-65 and sent to lab 6/13/2012. <br />*4 Upper Newlin creek flow was recorded from 4/3/2012 to 5/15/20on 5/25/2012 <br />*5 Sent to DRMS April 30, 2012. A copy is retained at the mine office <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br />1515 <br />Page of <br /> <br /> <br />