Laserfiche WebLink
Interoffice Memorandum <br />To: Rob Zuber <br />From: Zach Trujillo <br />Subject: Colowyo — Second Quarter 2012 West Pit Fill Monitoring Report <br />Date: 6/26/2012 <br />i•• <br />After my review of the Second Quarter West Pit Fill Monitoring Report for the year 2012, 1 find the report in compliance <br />with the following rules: <br />1. 4.09.1(11)(a) — The fill was inspected for stability by a registered engineer during the placement and compaction <br />of fill materials. <br />2. 4.09.1(11)(b) —The qualified registered engineer provided to the Division a certified report within two weeks <br />after the inspection that the fill is being constructed as specified in the design approved by the Division. The <br />South Taylor Fill was inspected on May 15, 2012 through May 29, 2012 and the Quarterly Fill Monitoring Report <br />was received by the Division on June 1, 2012. No appearances of instability, structural weakness, and other <br />hazardous conditions were noted in the inspection report. <br />3. 4.09.1(11)(c) — Rule 4.09(11)(c) is no longer applicable during this stage of fill construction. <br />The 2012 Second Quarter West Pit Fill Monitoring Report for Colowyo Mine meets all rules required by the Division. If <br />you have any questions, feel free to contact me. <br />Thanks, <br />Zach <br />