Laserfiche WebLink
AL <br /> St?NNYSIDE GOLD CORPORATION <br /> AN ECX0 8AY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 -Telecopy (303) 387-5310 <br /> Assumptions of Sunnyside Gold Concerning Contemplated Voluntary <br /> Cleanup Activities <br /> Upper Animas River Basin, Colorado <br /> DATE: January 12, 1995 <br /> 1. Proposals for voluntary cleanup are part of a privileged and <br /> private settlement negotiation between Sunnyside Gold <br /> Corporation ("SGC" ) and the Water Quality Control Division of <br /> the Colorado Department of Public Health and Environment <br /> ("WQCD") . This discussion is being entered into to resolve <br /> issues that gave rise to the lawsuit captioned Sunnyside Gold <br /> Corporation v. Colorado Water Quality Control Division, <br /> Colorado Department of Health, Civil Action No. 94CV 5459. <br /> 2. The Sunnyside Mine represents a technically sound place to use <br /> hydraulic seals to effect mine closure as part of final <br /> reclamation. SGC and state agencies believe that plugging of <br /> the Sunnyside Mine is the best and most technically feasible <br /> approach to ending drainage from the mine, as part of the <br /> overall plan for final reclamation. <br /> 3 . Placement of the main hydraulic seal within the American <br /> Tunnel will result in the filling of the mine workings over a <br /> period of time. This will eventually reverse the artificial <br /> hydrological conditions that currently exist within the <br /> mountain, and return the groundwater flow regime within the <br /> mountain to nearly natural conditions. Sealing and flooding <br /> the mine may have effects that include, but are not limited <br /> to, the eventual migration to the surface of water from the <br /> filled mine pool as pool water becomes part of the <br /> hydrological regime, and changes in f low of natural seeps and <br /> springs as water that formerly flowed into the cone of <br /> depression of the mine and out the American Tunnel resumes its <br /> natural flow paths around the mine. Voluntary cleanup <br /> activities undertaken by SGC as a result of this negotiation <br /> will be deemed to be mitigation for potential effects of SGC's <br /> reclamation of the Sunnyside Mine by sealing and flooding its <br /> workings. <br /> a. Once a program of voluntary cleanup is agreed <br /> upon, adopted, and carried out as agreed upon by the <br /> parties, WQCD will consider effects resulting from <br /> plugging of the Sunnyside Mine to have been mitigated, <br /> and will refrain from citing or prosecuting SGC, its <br /> parent, agents, officers, directors or employees in the <br /> event such effects are detected. <br />