Laserfiche WebLink
SLMIYSIDE GOLD CORPORATION <br /> SLMIYSIDE MINE M K)fAD PROJECT at PROPERTY LINE <br /> LOADING FROM WATER PASSINGG THM SLMrYSIDE MINE: <br /> Case 1 4:1 six Case 1 1:1 six Case 1+3 4:1 six Case 1+3 1:1 six <br /> flm=70 GPM fla=70 GPM fiow--14 GPM flow=74 GPM <br /> ANALYTE Qb/day) (lb/day) (lb/day) Qb/day) <br /> Fe 0.00 0.00 0.00 0.00 <br /> Mn 0.00 0.00 0.00 0.00 <br /> a 0.22 0.20 0.23 0.21 <br /> Zn 7.54 18.89 7.97 19.97 <br /> Cd 0.01 0.03 0.01 0.04 <br /> Pb 0.15 0.37 0.16 0.39 <br /> PH 7.82 7.82 7.82 7.82 <br /> Case 2 4:1 six Case 2 1:1 six Case 2+4 4:1 six Case 2+4 1:1 six <br /> flow=200 GPM fImFM GPM flow=360 GPM flow360 GPM <br /> ANALYTE !lb/day) Qb/day) !lb/day) Qb/day) <br /> Fe 0.00 0.00 0.00 0.00 <br /> Mn 0.00 0.00 0.00 0.00 <br /> a 0.62 0.58 1.12 1.04 <br /> Zn 21.54 53.98 3B.78 97.16 <br /> Cd 0.02 0.10 0.04 0.17 <br /> Pb 0.43 1.06 0.78 1.90 <br /> PH 7.82 7.82 7.82 7.82 <br /> - 9 - <br />