Laserfiche WebLink
Month <br />Stagecoach Pit <br />Net Monthly <br />Depletions at <br />the River <br />(acre -feet) <br />Worthing Pit <br />Net Monthly <br />Depletions at <br />the River <br />(acre -feet) <br />Both Pits <br />Combined <br />Monthly <br />Depletions at <br />River <br />(acre -feet) <br />Transit Loss <br />Metro to <br />Brighton <br />2 <br />(acre -feet) <br />Total Required <br />Monthly <br />Replacement <br />(acre -feet) <br />Available <br />Leased Water <br />(acre -feet) <br />Amount of <br />Additional <br />Replacement <br />Water Needed <br />(acre -feet) <br />Total <br />Replacement <br />Water <br />(acre -feet) <br />January <br />0.00 <br />0.30 ?{ <br />0.30 <br />0.02 <br />0.32 <br />0.00 <br />0.32 <br />0.32 <br />February <br />0.59 <br />0.44 <br />1.04 <br />0.06 <br />1.10 <br />1.26 <br />-0.16 <br />1.10 <br />March <br />0.84 <br />0.58 <br />1.42 <br />0.09 <br />1.50 <br />1.60 <br />-0.10 <br />1.50 <br />April <br />1.06 X <br />0.92 <br />1.98 <br />0.12 <br />2.10 <br />1.92 <br />0.18 <br />2.10 <br />May <br />1.24 XC <br />1.23 <br />2.47 <br />0.15 <br />2.62 <br />2.20 <br />0.42 <br />2.62 <br />June <br />1.49 <br />1.74 <br />3.23 <br />0.19 <br />3.42 <br />2.61 <br />0.81 <br />3.42 <br />July <br />1.68 <br />1.86 <br />3.54 <br />0.21 <br />3.75 <br />2.88 <br />0.87 <br />3.75 <br />August <br />1.40 <br />1.67 <br />3.06 <br />0.18 <br />3.25 <br />2.20 <br />1.05 <br />3.25 <br />September <br />1.36 <br />1.37 <br />2.72 <br />0.16 <br />2.89 <br />2.15 <br />0.74 <br />2.89 <br />October <br />1.24 <br />0.97 <br />2.21 <br />0.13 <br />2.34 <br />1.92 <br />0.42 <br />2.34 <br />November <br />0.92 )C <br />0.56 <br />1.48 <br />0.09 <br />1.57 <br />1.26 <br />0.31 <br />1.57 <br />December <br />0.27 )( <br />0.40 <br />0.67 <br />0.04 <br />0.71 <br />0.00 <br />0.71 <br />0.71 <br />Totals <br />12.09 <br />12.04 <br />24.13 <br />1.45 <br />25.58 <br />20.00 <br />5.58 <br />25.58 <br />Table 3 Required Replacement Water - BOTH Stagecoach and Worthing Pits <br />Albert Frei and Sons, Inc. <br />Notes: <br />' From Table 2 far right column, depletions at the South Platte River based on results of Glover analysis. <br />` Transit loss estimated at 0.5% per mile <br />Mileage from Metro Wastewater Treatment Plant to <br />Transit Loss = <br />Total Transit loss = <br />12.0 miles <br />0.5% per mile <br />6.0% <br />3 A total of 20.00 acre -feet of replacement water will be delivered per year under the amended June 13, 2011 lease agreement with the City <br />of Aurora, Colorado; City of Aurora committed to release 20.00 acre -feet of additional water if needed (40.00 acre -feet total). <br />0 <br />1.60 <br />1.90 <br />?.a! <br />3.09 <br />a•y <br />/.y2 <br />0.38 <br />