Laserfiche WebLink
Month <br />Total Monthly <br />Depletions <br />(acre -feetl 1 <br />Transit Loss <br />Metro to <br />Brighton <br />(acre -teen 2 <br />Total Required <br />Montle 3 <br />Repliiceioent <br />(acfe <br />Available <br />Leased Water <br />(acre- feetl <br />January <br />0.00 <br />0.00 <br />-0.00. <br />0.00 <br />February <br />1.19 <br />0.07 <br />1.26 <br />1,26 <br />March <br />1.51 <br />0.09 <br />1:0 . _._ _' <br />._ 140 <br />April <br />1.81 <br />0.11 <br />192 <br />1.92 <br />May <br />2.07 <br />0.12 <br />420 <br />2.20 <br />June <br />2.46 <br />015 <br />2:153 <br />2,61 <br />July <br />2.72 <br />0.16 <br />2,88 <br />2,88 <br />August <br />2.07 <br />0.12 <br />i <br />220 <br />220 <br />September <br />2.03 <br />0.12 <br />.2.15 <br />2.15 <br />October <br />1.81 <br />0.11 <br />1:92 <br />t92 <br />November <br />1.19 <br />0.07 <br />126 <br />1:26 <br />December <br />0.00 <br />0.00 <br />0.00 <br />0.00 , <br />Totals <br />18.86 <br />1.13 <br />20.00 <br />20.00 <br />Table 2 Leased Water to Meet Replacement <br />Albert Frei and Sons, Inc - WorthingFit and Stagecoach Pit <br />06/02/11 <br />Notes: <br />1 From Table 1, .far right coluom. <br />3 Transit lois estimated at 0.5% per mile <br />Mileage from Metro Wastewater <br />Treatment Plant to Operation = 12.0 miles <br />Transit Loss = 0.5% per mile <br />Total Transit loss = 6.0% <br />3 Atotal of16.19a«e -feet ofteplacementwate rwillbedel ive redyuyurleader tbe'May17,2011keseagroamaatwith <br />Ilse City of Aurora, Coloado. <br />