Laserfiche WebLink
NOTES AND COMMENTS ATTACHED TO 2012 ANNUAL REPORT FOR HAY CAMP PIT <br />(COMBINED) M- 1990 -025 <br />1. Although there has been no substantial change in affected lands since the 2011 <br />annual report, a report map is submitted that shows both current affected, <br />reclaimed, released, etc. lands as of 31 May 2012, and also shows potential <br />permit amendment changes being considered for 2012, pending County review. <br />2. We do intend to submit an application for a permit amendment in the next <br />month or two, which may include changes in affected lands and the permit <br />boundary. This will be discussed before actual submittal; please consider this <br />report to be our notice of intent. <br />3. No formal request was made for reclamation release of land in 2011; we are <br />planning to submit a separate request for reclamation release of the lands as <br />indicated, in 2012. This is dependent on County review and weather conditions. <br />Extremely dry conditions in the late Winter and Spring of 2012 have had <br />detrimental effects on vegetation in the area. <br />4. In the 2011 -12 permit year, Montezuma County Road Department extracted and <br />shipped approximately 250,000 tons of material; McStone Aggregates extracted <br />and shipped approximately 60,000 tons of material. <br />5. Weed control, fire protection, storm water, and other plans have been updated <br />as of May 2012, and will be submitted as needed with the permit amendment <br />application. <br />Digitally signed by Nathan A Barton <br />Nathan A Barton DN. cn= Nathan A Barton, o= WASTELINE, INC„ <br />ou =CE, PE, DEE, email= Wasteline6 @aol.com, c =US <br />Date: 2012.06.22 08:49:30 -06'00' <br />