Laserfiche WebLink
M <br /> I <br /> Mine Plan Revisions Needed <br /> Mine Name Approval Date Material Needed Revision Description <br /> West Elk Mine Unknown Need revised Sec. 2.05 Disposal of Gob from <br /> the Bear Mine in the <br /> Mountain Coal Company <br /> refuse pile field decision. <br /> West Elk Mine 07/22/93 Need Exh. 53 Reclaim Raven Mesa <br /> exploration road. <br /> West Elk Mine 08/27/93 Need p. 53 & 54 Construct concrete <br /> gravel bunker. <br /> West Elk Mine 04/28/93 Need p. 53 Repair of conveyor <br /> bents. <br /> West Elk Mine 10/28/93 Need Exh. 66 Pave bathhouse parking <br /> lots and ditches. <br /> West Elk Mine 10/28/93 Need Map 54 Install French drains. <br /> West Elk Mine 12/21/93 Need Map 54, Figure Refuse pile minor <br /> 2.OA reconfiguration. <br /> APEX #2 10/13/93 Need pp. 16.2-10 Modify reclaimed <br /> channel. <br /> APEX #2 01/28/94 Need p. 181A Highwall Reclamation <br /> plan. <br /> King Coal Mine 07/21/93 Need App. P.I. Size change for waste <br /> pile drain. <br /> New Elk Mine 02/16/94 Need Map 11 Installation of acid <br /> storage tank at <br /> processing plant. <br /> Golden Eagle 09/13/93 Need p. 2.05-8, Map 10 Two fan installations. <br /> Mine <br /> Golden Eagle 03/19/93 Need pp. 2.05-1., 2, 8, One pump methane <br /> Mine Exh. 19, Map 18 venting test. <br /> Golden Eagle 11/05/93 Need p. 2.05-25(B) Revise seeding rate. <br /> Mine <br />