Laserfiche WebLink
8 of 16 <br /> COAL BASIN PERMIT WORKSNEET <br /> Requirements Time Est . <br /> q Responsible Comments Required Cost 1 <br /> 7. Energy resources in mine plan area to include ; coal crop lines ; Bill plus consultant? <br /> strike and dip of coal to be mined ; active , inactive, abandoned <br /> ynderground mines (Including mine openings) ; surface mine areas <br /> (A4tivAr Innative, AIiandoned) l and gee , and oil wall• (with depth <br /> and elevation) . <br /> 8. Environmental features in mine plan area and adjacent areas to Doug and Bill <br /> Include ; air monitoring stations (with elevation) ; water moni- <br /> toring stations (with elevation) ; vegetation reference and study <br /> areas ; fish and wildlife study sites (with elevation) ; location <br /> and extent of groundwater; streams , lakes , ponds , springs , <br /> manmade or natural drains , irrigation ditches ; and water wells I <br /> (with elevation and depth) . <br /> 9. Existing characteristics of permit area to include; existing Bill ? <br /> areas of spoil , waste, and non-coal waste disposal , dams , <br /> embankments ; water treatment facilities (existing and proposed) ; <br /> air pollution control facilities (existing and proposed) ; and <br /> other impoundments . <br /> 10. Slope analysis of permit area with sufficient measurements to Bill ? <br /> adequately represent the existing land surface configuration of <br /> the area that will be affected by surface operations and facilities <br /> (See 883. 25 (k) for specifications) . <br />