Laserfiche WebLink
4 of 16 <br /> COAL BASIN PERMIT WORKSHEET <br /> Time Est. <br /> Requirements Responsible Comments Required Cost S t <br /> ENVIRONMENTAL RESOURCES INFORMATION (Part 783) Doug/overall <br /> A. Description of Mine Plan Area (783 . 12) <br /> 1 . Size, sequence, and timing of sub-areas for which individual permits Bill and Doug must prepare <br /> will be requested during the life of the mine. <br /> 2. Description of cultural , historical , and archaeological resources Work out arrangement with consul ant <br /> and features in mine plan area. on town of Coal Basin site. Let ers <br /> B. Description of Hydrology and Geology (783 . 13) to State Historical PreservationOfficer sent by Diane <br /> General description of the geology, hydrology and water quality Doug Phase IWilliams—Owens Consultant hired $6,000 <br /> and quantity for the general area (confine the area to within Preliminary report by Mar. 1 '80 *Phase II <br /> several miles of the mine) <br /> C. Geology of Mine Plan Area (783 . 14) <br /> 1 . General statement of the geology of the mine plan area down to the To be accomplished in conjunctio <br /> first aquifer below the lowest seam to be mined. with part B <br /> 2, Collect and analyze drilling samples from the permit area , surface <br /> disturbance area, and mine plan area of each stratum. <br /> D. Groundwater of Mine Plan Area (783 . 15) <br /> 1 , Describe ground water hydrology (Aquifers and water table, depth Also, to be accomplished in <br /> and extent, lithology and thicl<ness , uses , quantity, and quality. ) conjunction with Part B & C <br /> 2. Describe the recharge storage and discharge characteristics of <br /> the local aquifers . *Extent of require— <br /> m nt will be dependent <br /> u on the findings of <br /> P ase I <br />