My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (279)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (279)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:35:30 AM
Creation date
6/25/2012 1:44:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-19- <br /> Sediment Ponds (Revegetation costs included in cost for associated disturbed area) <br /> Backfilling and Grading $ 5,396.00 <br /> Preparation Plant Area <br /> Area - 35 Acres (See Post-Mining Land Use) <br /> Structures Removal $120,000.00 <br /> Rough and Smooth Grading and <br /> Scarifying 17,500.00 <br /> Amendments, Fertilizers, <br /> Planting & Mulching 28,000.00 <br /> Roads - 5.0 Acres 6,500.00 <br /> $171,500.00 <br /> Carbondale Train Loadout (See Post-Mining Land Use) <br /> Area - 5 Acres <br /> Structures Removal $ 30,000.00 <br /> Rough and Smooth Grading and <br /> Scarifying 2,500.00 <br /> Amendments, Fertilizers, <br /> Planting& Mulching 4,000.00 <br /> $ 16,500.00 <br /> Roads Misc. - 5 days <br /> Area - 26 Acres <br /> Structures Removal $ 5,000.00 <br /> Rough and Smooth Grading and <br /> _Scarifying 181,717.00 <br /> Amendments, Fertilizers, <br /> Planting & Mulching 20,800.00 <br /> $207,517.00 <br /> Power Lines Misc. (No revegetation required) <br /> Structures Removal (10 days) $ 20,000.00 <br /> TOTALS <br /> No. I Mine $207 ,410.00 <br /> No. 2 Mine 91,132.00 <br /> No. 3 Mine 588,760.00 <br /> No. 4 Mine 305,894.00 <br /> No. 5 Mine 148,455.00 <br /> Tunnel 179,030.00 <br /> Preparation Plant 171,500.00 <br /> Train Loadout 36,500.00 <br /> Roads, Misc. 207,517.00 <br /> Power Lines, Misc. 20,000.00 <br /> Topsoiling 14,494.00 <br /> Sediment Ponds 5,396.00 <br /> TOTAL $7,970 ,l48.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.