My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (279)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (279)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:35:30 AM
Creation date
6/25/2012 1:44:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-17- <br /> Haul time loaded (pg. 306, CFI) 0. 75 minutes <br /> Return time (pg. 307, CP) 0.65 <br /> Load, dump and grade time 1.00 <br /> Total Cycle Time 2.40 minutes <br /> Since the loader is hauling topsoil, the bucket should have a fill factor of <br /> 100%. Therefore, in a 50 minute working hour, a 992C loader with a 10.9 yd3 <br /> bucket can move 227 yd3. At this rate, it would take 60 hours to topsoil the <br /> three areas. <br /> A 992C loader rents for $23,010 per month. Adjusting for the 10% location factor, <br /> the rental rate would be $25,311.00. Assuming 22 days per month and 8 hours per <br /> day, the hourly rental rate would be $143.81. The hourly cost would be $143.81 <br /> plus $82.75 hourly operating cost, which equals $226.56 per hour. <br /> The total cost for topsoiling would be: <br /> 1 - 992C loader: 60 hours @ $226.56/hr. _ $13,594.00 <br /> 1 - Operator: 60 hours @ $ 15.00/hr. _ $ 900.00 <br /> TOTAL COST: $14,494.00 <br /> The following are the total estimated costs involving all five mines, tunnel, <br /> preparation plant, roads and the Carbondale train loadout: <br /> No. 1 Mine <br /> Area - 17 Acres <br /> Structures removal & Sealing $104,000.00 <br /> Rough and Smooth Grading and <br /> Scarifying 61,770.00 <br /> Amendments, Fertilizers, <br /> Planting & Mulching 13,600.00 <br /> Roads - 17 Acres 22,100.00 <br /> $201,470.00 <br /> No. 2 Mine <br /> Area - 13 Acres <br /> Structures Removal & Sealing $ 60,000.00 <br /> Rough and Smooth Grading and <br /> Scarifying 20,732.00 <br /> Amendments, Fertilizers, <br /> Planting & Mulching 10,400.00 <br /> Roads (included with #1 Mine) <br /> $ 91,132.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.