-1 3- <br /> Tunnel Area <br /> To backfill the tunnel area highwall, 96,800 yd3 of material would have to be <br /> moved. This figure was determined, assuming a 60-foot highwall and a 2 acre area <br /> to be backfilled. The assumption is made that a D9U will be used to push the <br /> material to the highwall with an average push distance of 200 feet. The final <br /> slope would be at 30%. <br /> With a push distance of 200 feet, a D9U has an unadjusted production rate of <br /> 775 LCY/hr. The following adjustment factors apply to this operation: <br /> Condition Factor <br /> Average Operator 0. 75 <br /> Rock Material 0. 70 <br /> 50 Minute working hour 0.84 <br /> Grade Factor (15'.-(0+30%t2)) 0. 76 <br /> Altitude deration 0.94 <br /> Overall Factor 0.32 <br /> Therefore, a D9U can move 248 LCY/hr. At this rate, it would take 390 hours to <br /> complete this operation at the following cost: <br /> 1 - D9U dozer: 390 hours @ $127.001hr. _ $49,530.00 <br /> I - Operator: 390 hours @ $ 15.00/hr. _ $ 5,850.00 <br /> TOTAL COST: $55,380.00 <br /> Building Removal Costs <br /> The applicant did not include building removal costs for those structures at Mines <br /> No. 4 and No. 5 which would be left as part of a ski area post-mining land use. <br /> However, the Division must bond for removal of these buildings since Mid-Continent <br /> cannot presently show that it can attain the post-mining land use of a ski area. <br /> The Division based the building removal costs for Mines No. 4 and No. 5 on the <br /> average cost per square foot of structure as calculated by the applicant. The <br /> estimated building removal costs for Mine No. 4 are $84,200.00 and $40,575.00 <br /> for Mine No. 5. <br /> All other building removal costs were accepted by the Division. <br /> Haul Road Reclamation <br /> The applicant did not include any costs for downgrading the twelve miles of haul <br /> road from 22 feet in width to 11 feet. <br /> The Division's estimate is based on using a Caterpillar 245 backhoe which has a <br /> reach of 32 feet and a capacity of 2.5 cubic yards. laterial from the fill slope <br /> will be used to backfill the cut slope. From the attached cross-section, it was <br /> determined that 206,507 yd3 would have to be moved to downgrade the 12 miles of <br /> haul roads. <br />