My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (279)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (279)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 11:35:30 AM
Creation date
6/25/2012 1:44:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-10- <br /> Mine No. 4 <br /> The Mine No. 4 pad area is 2.86 acres in size and must be backfilled to an average <br /> depth of 20.25 feet. A D9U would have an average push distance of 400 feet and <br /> would be required to move 93,436 yd3 of material. The unadjusted production rate <br /> for a 400-foot push distance is 425 LCY/hr. The following are the production <br /> factors that apply to this operation: <br /> Condition Factor <br /> Average Operator 0. 75 <br /> Rock Material 0. 70 <br /> 50 minute working hour 0.84 <br /> Grade Factor 290 0.42 <br /> Altitude deration 0.94 <br /> Overall Factor 0.17 <br /> Under these conditions, a D9U has a production rate of 72 LCY/hr. and would require <br /> 1,297 hours to complete at the following cost: <br /> 1 - D9U dozer: 1,297 hours @ $127.00/hr. _ $164,719.00 <br /> 1 - Operator: 1,297 hours @ $ 15.00/hr. _ $ 19,455.00 <br /> TOTAL COST: $184,174.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.