Laserfiche WebLink
Coal Basin Mines <br /> List of Stipulations <br /> Stipulation No. 1 <br /> PRIOR TO REACTIVATION OF MINE NUMBER 4, THE PERMITTEE MUST <br /> CONSTRUCT THE SEDIMENT PONDS, AS DESIGNED, ON THE SOUTHEAST SIDE OF <br /> THE MINE NO. 4 BENCH. <br /> Stipulation No. 2 <br /> WITHIN 30 DAYS OF PERMIT ISSUANCE, THE PERMITTEE MUST REVISE THE <br /> SEDIMENT CONTROL PLANS FOR THE THREE PROPOSED SEDIMENT PONDS AT THE <br /> SITE OF THE NEW COAL PROCESSING WASTE EMBANKMENT. THE PLANS MUST <br /> BE REVISED TO INCLUDE A NON-CLOGGING, GATED DEWATERING DEVICE <br /> LOCATED DIRECTLY ABOVE THE MAXIMUM STORAGE LEVEL OF EACH POND. <br /> Stipulation No. 3 <br /> WITHIN SIX MONTHS OF PERMIT ISSUANCE, THE PERMITTEE SHALL SUBMIT TO <br /> THE DIVISION CERTIFICATION FROM A REGISTERED PROFESSIONAL ENGINEER, <br /> ATTESTING THAT THE SEDIMENT PONDS PRESENTLY CONSTRUCTED HAVE BEEN <br /> BUILT AS DESIGNED. CERTIFICATION OF THOSE PONDS YET TO BE <br /> CONSTRUCTED MUST BE SUBMITTED IMMEDIATELY FOLLOWING CONSTRUCTION. <br /> Stipulation No. 4 <br /> BY FEBRUARY 1, 1984, THE PERMITTEE SHALL SUBMIT AN ACCEPTABLE PLAN <br /> FOR SEALING THE ROCK TUNNEL ADITS. THIS PLAN SHALL CONTAIN, AT A <br /> MINIMUM, SPECIFICATIONS FOR SEALING THE PORTIONS OF THE ROCK TUNNEL <br /> THAT CROSS THE COZZETTE, ROLLINS, AND MIDDLE SANDSTONES TO PREVENT <br /> FUTURE MIXING OF WATERS IN THESE AQUIFERS AND SHALL INCLUDE <br /> SPECIFICATIONS FOR SEALING THE ADITS TO PREVENT GROUND WATER FROM <br /> FLOWING FROM THE ROCK TUNNEL ONTO THE SURFACE. <br /> Stipulation No. 5 <br /> PRIOR TO ANY DISTURBANCE AT THE PROPOSED COAL PROCESSING WASTE <br /> DISPOSAL AREA, WITH THE EXCEPTION OF THE SITE ACCESS ROAD, THE <br /> PERMITTEE MUST SUBMIT AND RECEIVE THE DIVISION'S APPROVAL OF A <br /> COMPREHENSIVE TOPSOIL SALVAGE AND REDISTRIBUTION PLAN. THIS PLAN <br /> MUST BE BASED ON SITE-SPECIFIC SOIL DEPTH INFORMATION AND SOIL <br /> ANALYSES. AT A MINIMUM, ONE SITE PER SOIL TYPE MUST BE SAMPLED AND <br /> ANALYZED. SA14PLES MUST BE TAKEN BY HORIZON OR TWELVE-INCH <br /> INCREMENTS, WHICHEVER IS SMALLER, TO A MINIMUM DEPTH OF FOUR FEET. <br /> IN ADDITION, AT LEAST THREE SOIL DEPTH VERIFICATION SITES MUST BE <br /> SAMPLED WITHIN EACH SOIL TYPE TO A MINIMUM DEPTH OF FOUR FEET. <br />