My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991-02-28_INSPECTION - C1981017
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981017
>
1991-02-28_INSPECTION - C1981017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2021 6:44:56 AM
Creation date
6/25/2012 12:25:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
INSPECTION
Doc Date
2/28/1991
Doc Name
Inspection Reports/ Documents for year
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> f <br /> RECEIVED <br /> BEFORE THE MINED LAND RECLAMATION BOARD FEB 2 8 1991 <br /> STATE OF COLORADO <br /> Mined Land <br /> File No. C-81-017 Reclamation Division <br /> ----------------------------------------------------------------- <br /> ORDER <br /> ----------------------------------------------------------------- <br /> IN THE MATTER OF MID-CONTINENT RESOURCES, INC. ; <br /> TECHNICAL REVISION NO. 17 <br /> ----------------------------------------------------------------- <br /> This matter comes before the Mined Land Reclamation Board <br /> ( "Board" ) upon the parties' Joint Motion for the Approval of <br /> Technical Revision No. 17. The Board, having reviewed this mat- <br /> ter hereby modifies the Mined Land Reclamation Division' s pro- <br /> posed decision in this matter by the addition of the following <br /> conditions: <br /> 1. Construction of the water treatment facility shall <br /> begin before the resumption of coal production at the site; <br /> 2. The water treatment facility shall be completed and <br /> operational within sixty days of the resumption of coal produc- <br /> tion at the site; and <br /> 3. Neither the approval of this technical revision, nor <br /> the grant of sixty days in which to complete construction, shall <br /> operate to relieve Mid-Continent of the duty to fully comply with <br /> all applicable standards, regulations and requirements. <br /> THE BOARD hereby affirms the proposed decision, as modi- <br /> fied. <br /> DATZD this Zday of February 1991. <br /> H. COOLEY <br /> dtaIkman <br /> Mined Land Reclam ion Board <br /> AG Alpha No. ????ALPHA <br /> AG File No. E9116915. 49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.