My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-02-06_REVISION - M1977378
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977378
>
1995-02-06_REVISION - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2021 4:50:11 PM
Creation date
6/25/2012 11:43:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
REVISION
Doc Date
2/6/1995
Doc Name
Constr. Cert. Rpt.
From
Sunnyside Gold Corp
To
DMG
Type & Sequence
TR16
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
999 <br /> SUNNYSIDE GOLD CORPORATION <br /> AN ECUO DAY COMPANY <br /> P.O. Box 177 .Silverton, CO 81433 <br /> Phone (303) 387-5533 .Telecopy (303) 387-5310 <br /> February 2, 1995 <br /> 0 6 1999 <br /> Allen Sorenson, Reclamation Specialist <br /> Department of Natural Resources <br /> Division of Minerals and Geology iu�sit`�Uf Minerals&Geology <br /> 1313 Sherman Street, Room 215 <br /> Denver , CO 80203 <br /> RE: File No . M-77-3 /8 , TR-14, TR-1'6 <br /> Terry Tunnel Bulkhead <br /> l-Anstruction Certification Report <br /> Dear Mr . Sorenson: <br /> This letter report is to provide certification that construction of <br /> the Terry Tunnel Bulkhead meets or exceeds design criteria. <br /> Certification is required in the April 15, 1993 DMG adequacy <br /> concern letter (Item 4) and was committed to by SGC. <br /> The construction stages requiring certification are listed below. <br /> 4a) Bulkhead location preparation (scaling and washing) . <br /> The bulkhead site was scaled clean of loose material and sand <br /> blasted to remove any surface coating that may have been <br /> present. It was then washed down and vacuumed clean of water , <br /> sand and rock residue. This stage of site preparation was <br /> adequate to maximize the potential for bonding between the <br /> rock and concrete bulkhead. <br /> This stage of site preparation was also inspected by John F. <br /> Abel , Jr . , P.E . (see attached letter report) before pouring <br /> and by DMG during a pre-pour inspection on 8/31/94. <br /> 4b) Laying of by-pass or diversion pipe. <br /> A by-pass or diversion pipe was not included in the original <br /> design of the Terry Tunnel bulkhead . TR No . 16 was submitted <br /> and approved to include a diversion pipe . This pipe was to be <br /> a 6 inch diameter Schedule 80, Grade 316L stainless steel <br /> pipe. A thrust/seep collar , Grade 316L stainless steel , 3/8 <br /> inch thick and 10 5/8 inches diameter was to be placed a <br /> minimum of 5. 5 feet from the downstream face to transfer <br /> loading to the rib and prevent seepage along the pipe-concrete <br /> contact. <br />
The URL can be used to link to this page
Your browser does not support the video tag.