My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-06-07_ENFORCEMENT - M1977378
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1977378
>
1995-06-07_ENFORCEMENT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 6:59:14 PM
Creation date
6/25/2012 11:43:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
ENFORCEMENT
Doc Date
6/7/1995
Doc Name
Draft Consent Decree
From
AGO
To
DMG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FROM :RGO NAT. RES. SECTION 303 832 8106 199' 1-,-07 08:16 #575 P.09/18 <br /> - American Tunnel Inflow-Sampled monthly for dissolved and total <br /> recoverable metals until no flow exists or permits are released. Weekly <br /> flow measurements will be taken until no flow exists or permits are <br /> released. <br /> - Cement Creek Inflow-Sampled monthly for dissolved and total <br /> recoverable metals while Cement Creek is diverted. Weekly flow <br /> measurements until the diversion stops. <br /> - American.Tunnel Effluent- Sampled weekly for total recoverable metals <br /> in accordance with the CAPS permit and monthly for dissolved lead, <br /> copper,zinc,cadmium and mercury. Cement Creek below its confluence <br /> with the American Tunnel effluent will be sampled monthly for total and <br /> dissolved metals until Cement Creek diversion and treatment of American <br /> Tunnel waters ceases. <br /> - Terry Tunnel Inflow-If flow exists,inflow will be sampled monthly, . <br /> when accessible,for dissolved and total recoverable metals until no flow <br /> exists or permits are released. Weekly flow measurements until no flow <br /> exists or permits are released. <br /> - Terry Tunnel Effluent-If treatment is required due to flow from portal, <br /> effluent will be sampled,when accessible,weekly for total recoverable <br /> metals in accordance with the CDPS permit and monthly for dissolved <br /> metals until no flow exists. <br /> Sampling of other areas per SGC's NER permit will continue until SGC is <br /> released from its obligations by NII.RD. Sampling of other areas per <br /> SGC's CDPS/NPDES permits will continue until SGC is released from <br /> those permit obligations. <br /> b. Mitigation Sites. SGC will monitor water flowing from or flowing past <br /> mitigation project sites for dissolved base metals starting in 1995. Sampling will stop <br /> two years after each project is completed. Where possible, SGC will collect samples <br /> above,below,and at the mitigation site. Four sample periods will be done yearly with <br /> one at high flow,when the site is accessible, and one at low flow,late fall. <br /> C. Water Quality Reference Point. [To be added with control chart concept.] <br /> s9sca.�,sros 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.