My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1995-06-07_ENFORCEMENT - M1977378
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M1977378
>
1995-06-07_ENFORCEMENT - M1977378
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 6:59:14 PM
Creation date
6/25/2012 11:43:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977378
IBM Index Class Name
ENFORCEMENT
Doc Date
6/7/1995
Doc Name
Draft Consent Decree
From
AGO
To
DMG
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f:ROM :AGO NAT. RES. SECTION 303 832 8106 1995,06-07 08:19 #675 P. 18/18 <br /> - Columbus Mine Portal-Animas Forks <br /> A bulkhead will be installed in two adits to prevent direct mine discharge in order to <br /> return the hydrologic regime to near premining conditions. <br /> - London Portal-Headwaters of Animas River <br /> A bulkhead will be installed in the adit to prevent direct mine discharge in order to return <br /> the hydrologic regime to near prPmining conditions. <br /> Schedule <br /> The voluntary mitigation projects will start shortly after valve closure and diversion of Cement <br /> Creek. Construction is confined to summer and fall months due to the heavy winter snowfalls <br /> that occur in the Upper Animas Basin. <br /> The "A" list of primary projects will be completed within the first two field seasons. Monitoring <br /> at the reference point for removal of metals loading begins concurrently. Upon completion of the <br /> "A"list of voluntary projects, SGC will then start on the "B" list or secondary list of voluntary <br /> projects, if the projects are successful in removing dissolved zinc loading from the Upper <br /> Animas River all voluntary projects required to maintain ambient quality will be completed in 3 <br /> to 4 years. <br /> MM-4&M <br />
The URL can be used to link to this page
Your browser does not support the video tag.