Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT <br />Mine -Site Evaluation Inspection Report <br />1. Permittee/Person <br />MID- CONTINENT RESOURCES <br />2. Address <br />PO BOX 1298 <br />3. City <br />GLENWOOD SPR. <br />5. Zip Code <br />81602 <br />7. Operator if Different than Penmittee <br />PITKIN IRON CO <br />8. Mine Name <br />1 6. Phone Number <br />COAL BASIN <br />4. State <br />CO <br />24. Performance St agy <br />Codes: 1=Compliance, 2= Noncompliance, 3 =Not Planned, <br />9. Permit Number <br />C -81 -017 <br />11. Inspection Date <br />07/07/93 <br />UM - nn - rr <br />14. Permit Status <br />BF <br />17. OSM Office # <br />020 <br />20. M.S.H.A. ID # <br />05 -00469 <br />091955 <br />12. Inspection Type 13. Joint Inspection <br />CC <br />15. Site Status 16. Facility Type <br />FP <br />21 State Code <br />08 <br />23. AVS Permittee Entity ID Number <br />10. Type <br />a. Permit b. RA <br />NP <br />Y <br />Y/N <br />B <br />18 RSI # 19. Land Code <br />FS <br />097 <br />n <br />22. County Code <br />dard Categories <br />4 =Not Started,5= Noncompliance Identified Elsewhere <br />A. Administrative <br />1._Mining within Valid Permit <br />2._Mining within Bonded Area <br />3. Terms & Conditions of Permit <br />4._Liability Insurance <br />5._Ownership and Control <br />6 _Temporary Cessation <br />B. Hydrologic Balance <br />1. 2 Drainage Control <br />2._Inspections & Certifications <br />3._Siltation Structures <br />4._Discharge Structures <br />5. 2 Diversions <br />6._Effluent Limits <br />7._Ground Water Monitoring <br />8._Surface Water Monitoring <br />9._Draituage -- Acid -Toxic Materials <br />10._Impoundments <br />11. Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1._Removal <br />2._Substitute Materials <br />3._Storage and Protection <br />4. Redistribution <br />D. Backfilling & Grading <br />1 _Exposed Openings <br />2. Contemporaneous Reclamation <br />3._Approximate Original Contour <br />4._Highwall Elimination <br />5._Steep Slopes (includes downslope) <br />6. Handling of Acid & Tpxic Materials <br />7._ Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />1. Placement <br />2. Drainage Control <br />3._Surface Stabilization <br />4. Inspections & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1. 2 Drainage Control <br />2._Surface Stabilization <br />3. Placement <br />4. Inspections and Certifications <br />5._Impounding Structures <br />G. Use Of Explosives <br />1._Blaster Certification <br />2. Distance Prohibitions <br />3. Blast Survey/Schedule <br />4. Warnings & Records <br />5. Control of Adverse Effects <br />H. Subsidence Control Plan <br />I. Roads <br />1. Road Construction <br />2._ Certification <br />3. 2 Drainage <br />4._Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1. _Signs <br />2. Markers <br />K. _ Distance Prohibitions <br />L. Revegetation <br />1. Vegetative Cover <br />2._Timing <br />M. _ Postmining Land Use <br />N. Other <br />2 1) DEPRESSIONS <br />2) <br />3) <br />25. Inspection Frequency <br />a Date of Last <br />State Complete <br />Inspection <br />b. Number of <br />required <br />complete <br />inspections <br />c. Number of <br />required <br />inspections <br />4 <br />03/30/93 <br />Frequency for previous 4 Calendar Qtrs. <br />1 8 <br />Number of <br />complete <br />inspections <br />conducted <br />Number of <br />inspections <br />conducted <br />3 <br />8 <br />26. Inspection Hours <br />2.0 <br />4.5 <br />5.0 <br />5.0 <br />a. Permit Review <br />b. Inspection Time <br />c. Travel Time <br />d. Report Writing <br />27. Bonded Acres <br />a. Total <br />bonded <br />333.0 <br />0.0 <br />0.0 <br />0.0 <br />b. Phase I <br />released <br />c. Phase II <br />released <br />d. Phase III <br />released <br />28. Acres <br />0.0 <br />333.0 1 <br />a. Permitted <br />b. Disturbed <br />(Estimated) <br />I Page l of __ <br />