Laserfiche WebLink
rot f,e. ;, <br />_Ts ry- tetr41F <br />U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT <br />Mine -Site Evaluation Inspection Report <br />1. Permittee/Person <br />MID CONTINENT RESOURCES <br />2. Address <br />PO BOX 1298 <br />3. City <br />GLENWOOD SPR. <br />5. Zip Code <br />81602 <br />7. Operator if Different than Permittee <br />PITKIN IRON CO <br />8. Mine Name <br />6. Phone Number <br />COAL BASIN <br />4. State <br />CO <br />9. Permit Number <br />C- 81-017 <br />11. Inspection Date <br />07/23/93 <br />MM - DD - YY <br />14. Permit Status <br />BF <br />17. OS Office # <br />020 <br />20. M.S.H.A. ID # <br />05 -00469 <br />091955 <br />12. Inspection Type 13. Joint Inspection <br />FF <br />FP <br />18 RSI # <br />21 State Code <br />08 <br />23. AVS Permittee Entity ID Number <br />10. Type <br />a Permit b. RA <br />NP <br />N <br />Y/N <br />n <br />15. Site Status 16. Facility Type <br />B <br />19. Land Code <br />FS <br />22. County Code <br />097 <br />24. Performance Standard Categories <br />Codes: 1= Compliance, 2= Noncompliance, 3 =Not Planned, 4 =Not Started,5= Noncompliance Identified Elsewhere <br />A. Administrative <br />1. within Valid Permit <br />2. within Bonded Area <br />3. Terms & Conditions of Permit <br />4. Insurance <br />5. and Control <br />6. Temporary Cessation <br />B. Hydrologic Balance <br />1. 1 Drainage Control <br />2. & Certifications <br />3. Structures <br />4. Structures <br />5. Diversions <br />6. Effluent Limits <br />7. Water Monitoring <br />8. Water Monitoring <br />9. Drainage -- Acid -Toxic Materials <br />10. Impoundments <br />11.2 Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. Removal <br />2. Materials <br />3. Storage and Protection <br />4. Redistribution <br />25. Inspection Frequency <br />a Date of last <br />State Complete <br />Inspection <br />Frequency for previous 4 Calendar Qtrs. <br />b. Number of Number of <br />required complete <br />complete 0 inspections <br />inspections conducted <br />c. Number of Number of <br />required partial <br />partial inspections <br />inspect conducted <br />lo 1 <br />03/30/93 <br />0 <br />0 <br />D. Backfilling & Grading <br />1 _Exposed Openings <br />2. Contemporaneous Reclamation <br />3_ Approximate Original Contour <br />4. Highwall Elimination <br />5. Steep Slopes (includes downslope) <br />6._Handling of Acid & Toxic Materials <br />7._ Stabilization (rills and gullies) <br />E. Excess Spoil Disposal <br />1. Placement <br />2._Drainage Control <br />3._Surface Stabilization <br />4._Inspections & Certifications <br />F. Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1._Drainage Control <br />2. Surface Stabilization <br />3. Placement <br />4. Inspections and Certifications <br />5. Impounding Structures <br />G. Use Of Explosives <br />1. Blaster Certification <br />2._Distance Prohibitions <br />3._Blast Survey /Schedule <br />4. Warnings & Records <br />5. Control of Adverse Effects <br />26. Inspection Hours <br />1.0 <br />1.0 <br />7.0 <br />4.0 <br />a. Permit Review <br />b. Inspection Time <br />c. Travel Time <br />d. Report Writing <br />M. <br />27. Bonded Acres <br />a. Total <br />bonded <br />333.0 <br />0.0 <br />0.0 <br />0.0 <br />H. Subsidence Control Plan <br />I. Roads <br />1. Road Construction <br />2. Certification <br />3. <br />4. and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1. <br />2. Markers <br />K. _ Distance Prohibitions <br />L. Revegetation <br />1. Vegetative Cover <br />2. <br />N. Other <br />1) <br />2) <br />3) <br />b. Phase I <br />released <br />c. Phase II <br />released <br />d. Phase III <br />released <br />Postmining Land Use <br />28. Acres <br />0.0 <br />333.0 <br />a. Permitted <br />b. Disturbed <br />(Estimated) <br />Page 1 of <br />