Laserfiche WebLink
U. S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT <br />Mine -Site Evaluation Inspection Report <br />1. Permittee/Person <br />MID- CONTINENT RESOURCES, INC <br />2. Address <br />PO BOX 1298 <br />3. City <br />GLENWOOD SPR. <br />5. Zip Code <br />81602 <br />7. Operator it Different than Permittee <br />PITKIN IRON CO <br />8. Mine Name <br />COAL BASIN <br />1 0 1993 4. State <br />6. fnb6e‘' <br />CO <br />9. Permit Number <br />C -81 -017 <br />11. Inspection Date <br />09/08/93 <br />MM - DD - YY <br />14. Permit Status <br />ABl <br />17. OSM Office # <br />020 <br />20. M.S.H.A. ID # <br />05 -00469 <br />091955 <br />12. Inspection Type 13. Joint Inspection <br />CCR <br />15. Site Status 16. Facility Type <br />FP <br />18 RSI# <br />21 State Code <br />08 <br />23. AVS Permittee Entity ID Number <br />10. Type <br />a. Permit b. RA <br />NP <br />N <br />Y/N <br />S <br />B <br />19. Land Code <br />FS <br />22. County Code <br />097 <br />23b. State Office <br />24. Performance Standard Categories <br />Codes: 1= Compliance, 2= Noncompliance, 3 =Not Planned, 4 =Not Started,5= Noncompliance Identified Elsewhere <br />A. Administtive <br />1. Mining within Valid Permit <br />2. Mining within Bonded Area <br />3._Terms & Conditions of Permit <br />4. Liability Insurance <br />5._Ownership and Control <br />6._Temporary Cessation <br />B. Hydrologic Balance <br />1. 2 Drainage Control <br />2._Inspections & Certifications <br />3. Siltation Structures <br />4._Discharge Structures <br />5._Diversions <br />6._Effluent Limits <br />7._Ground Water Monitoring <br />8. Surface Water Monitoring <br />9. Drainage -- Acid -Toxic Materials <br />10. Impoundments <br />11. Stream Buffer Zones <br />C. Topsoil & Subsoil <br />1. Removal <br />2._Substitute Materials <br />3._Storage and Protection <br />4. Redistribution <br />D. <br />E. <br />F. <br />G. <br />Backfilling & Grading <br />1. Exposed Openings <br />2. Contemporaneous Reclamation <br />3._Approximate Original Contour <br />4._Highwall Elimination <br />5. Steep Slopes (includes downslope) <br />6._Handling of Acid & Toxic Materials <br />7._ Stabilization (rills and gullies) <br />Excess Spoil Disposal <br />1. Placement <br />2. Drainage Contml <br />3._Surface Stabilization <br />4. Inspections & Certifications <br />Coal Mine Waste <br />(Refuse Piles/Impoundments) <br />1._Drainage Control <br />2._Surface Stabilization <br />3. Placement <br />4. Inspections and Certifications <br />5._Impounding Structures <br />Use of Explosives <br />1._Blaster Certification <br />2._Distance Prohibitions <br />3._Blast Survey /Schedule <br />4. Warnings & Records <br />5. Control of Adverse Effects <br />H. Subsidence Control Plan <br />I. Roads <br />1. Road Construction <br />2._ Certification <br />3._Drainage <br />4. -Surfacing and Maintenance <br />5. Reclamation <br />J. Signs & Markers <br />1. Signs <br />2. Markers <br />K. _ Distance Prohibitions <br />L. Revegetation <br />1. Vegetative Cover <br />2. Timine <br />M. _ Postmining Land Use <br />N. Other <br />1) <br />2) <br />3) <br />25. Inspection Frequency <br />a. Date of Last <br />State Complete <br />Inspection <br />Frequency for previous 4 Calendar Qtrs. <br />b. Number of <br />required <br />complete <br />inspections <br />c. Number of <br />required <br />Ins pections <br />// <br />0 <br />0 <br />Number of <br />complete <br />inspections <br />conducted <br />Number of <br />partial <br />inspections <br />conducted <br />0 <br />0 <br />26. Inspection Hours <br />0.5 <br />0.0 <br />0.0 <br />0.5 <br />a. Permit Review <br />b. Inspection Time <br />c. Travel Time <br />d. Report Writing <br />27. Bonded Acres <br />a. Total <br />bonded <br />333.0 <br />0.0 <br />0.0 <br />0.0 <br />b. Phase I <br />released <br />c. Phase II <br />released <br />d. Phase III <br />released <br />28. Acres <br />0.0 <br />333.0 <br />a. Permitted <br />b. Disturbed <br />(Estimated) <br />Page 1 of 3 <br />Revised July 1.1993 <br />