Laserfiche WebLink
MINE ENGINEERING <br />MINE RECLAMATION <br />June 20, 2012 <br />Brock Bowles <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />MR -131, Revise design of Ditch D -3 as part of abatement of notice of <br />violation (NOV) CV- 2012 -004 <br />Permit C- 1996 -083 <br />Dear Mr. Bowles: <br />On behalf of Bowie Resources, LLC, (BRL), enclosed is an application for a minor <br />revision to revise the design and provide an as -built configuration of Ditch D -3 as part of <br />the abatement of NOV CV- 2012 -004. <br />Background <br />An NOV was issued to BRL on May 9, 2012 because coal mine waste was stacked <br />near the out slope of Gob Pile #4 for the purpose of drying and blocked Ditches D -8, D- <br />F1, and D -D3. DRMS determined that the design details for Ditch D -3 in the permit <br />made it difficult to determine the specifications for re- construction of the ditch. <br />Therefore the hydrology design for Ditch D -3 was revised and an as -built configuration <br />of the ditch is provided as a means to abate the Ditch D -3 portion of the NOV. <br />Right of Entry <br />Gob Pile #4 including all diversion ditches is on land owned by BRL. <br />Affected and Disturbed Area <br />There is no new disturbance. <br />Soils <br />No new soils study is required <br />J. E. STOVER & ASSOCIATES, INC. <br />2352NORTH 7 STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />Cultural Resources <br />No new cultural resource study required. <br />Access <br />Access is gained by the haul road up to the waste pile. <br />ffti.Cy _WO <br />Jug`\ , � .) <br />ma son. <br />p�v Niwiln and S ajefi1 <br />CIVIL ENGINEERING <br />CONST. MANAGEMENT <br />