Laserfiche WebLink
Conclusion <br />• The post mining land use plan as proposed in PR- <br />6 has been subject to considerable technical <br />scrutiny by the Division and was prepared by WFC <br />in consultation with the landowners. <br />• The Division is requesting that the Board uphold <br />the Division's proposed approval for the post- <br />mining land uses of irrigated cropland, irrigated <br />pastureland and dryland pasture as outlined in <br />PR -6. <br />