Laserfiche WebLink
INSPECTION REVORT Page 5 <br /> * Two large capacity diesel fuel tanks were noted without <br /> containment berms, an effort was made to verify requirment in their <br /> SPCC plan but it apparently does not cover that aspect nor do <br /> Colorado regs cover it sufficiently. <br /> CONSTRUCTION IN PROCESS and OTHER COMMENTS <br /> Six thousand feet of pipeline has been installed for mine water <br /> transportation from the rock tunnel to the district office yard . A <br /> multi-media sand filter system is being placed at the lower end of <br /> the pipe for the final treatment of the water prior to discharge . <br /> New batch plant construction on the #2 mine bench for longwall <br /> backfill and support . <br /> An attempt is underway to install another longwall in the mine, in <br /> the interim coal stockpiles are being filled out in anticipatation of <br /> shut down required for installation . <br /> Sediment ponds in general throughout the mine were clean and <br /> appearances were that the process was being done on a regular basis . <br /> /-\ Mine water was being discharged from the rock tunnel pond system, I+- <br /> w A� I v_� 4A �. T l O G Cw\4Lh t�G� G--ff lowe- <br />